Loft conversion and Refurbishment, Bates Road Brighton

Dec 18, 2018
1 min read
Updated: Apr 28

Day 9/10 - Both dormer sections are fully framed out, and the flat roof is completed. The external walls are sheathed using 11mm OSB plywood, covered with a breathable membrane and the 1st layer of roofing felt is applied. We now have a water-tight site and no need for any temporary weathering solutions.